Lean Techniques and Lead Time of failure resolution process in SD-WAN process

Original Article

Authors

  • Hugo Iván Ticona Gregorio Universidad Nacional Mayor de San Marcos

DOI:

https://doi.org/10.33936/riemat.v10i2.7820

Keywords:

Lean Manufacturing; Visual Management; Statistical Analysis; Standard Operating Procedure; Cycle Time.

Abstract

The objective of the research was to evaluate the impact of the combined application of Lean Visual Management and Standard Operating Procedures techniques on the Cycle Time of the Fault Resolution process in Software-Defined Wide Area Networks of a telecommunications service provider. The pre- and post-application stages lasted ten weeks each. The results showed a 27% reduction in Cycle Time, the statistical analysis carried out with the paired t-test showed that the result is statistically significant, with which it was concluded that the Lean techniques applied are alternatives for improvement to reduce operational variability and accelerate the resolution of failures in Software-Defined Wide Area Network environments. The results provide a framework for other organizations to adapt the techniques used in projects to improve their critical processes.

Downloads

Download data is not yet available.

References

Bastos, F.A., Jaguaribe, HL., Albertin, MR., Maia, RL. & De Castro, T. (2018). Application of visual management panel on an airplane assembly station. International Journal of Productiviy and Performance Management, 67(6), 1045-1062. doi: https://doi.org/10.1108/IJPPM-09-2016-0189

Da Rosa, R., Galhen, M.H., Ilha, S., Zamberlan, C, Barbosa, H.M. & Weiss, F. (2016). Procedimento Operacional padrão no ambiente Hospitalar: percepcão de enfermeiros. Cuidado é Fundamental, 8(4), 5095-5100. doi: https://doi.org/10.9789/2175-5361.2016.v8i4.5095-5100

Escudero, B. (2020). Mejora del Tiempo de Ciclo y productividad en el proceso de armado de pizzas aplicando herramientas de Lean Manufacturing. Ingeniería Industrial, 39(2020), 51-72. doi: https://doi.org/10.26439/ing.ind2020.n039.4915

Hushyar, K., Braun, h. & Eslambolchi, H. (2021). Telecom Extreme Transformation, The Road to a Digital Service Provider. USA, CRC Press.

Jiju, A., Vinodh, S. y Gijo, E. (2016). Lean Six Sigma for Small and Medium Sized enterprises a practical Guide. USA, CRC Press.

Ishak, FA., Johari, M.K., M & Dolah, R. (2018). A case study of Lean application for shortest Tiempo de Ciclo in composite repair shop. International Journal of Engineering & Technology, 7(4.13), 112-119. doi: 10.14419/ijet.v7i4.13.21341

Kasturi, R. (2020). Trends in SD-WAN and SDN. CSIT, 8, 21-27. doi: https://doi.org/10.1007/s40012-020-00277-5

Lara, G. y Jurado, RA. (2023). Análisis y Propuesta de Mejora en el Proceso de Producción de Yogurt griego de una empresa peruana mediante herramientas Lean. (5S). Ingeniería Industrial, 44, 37-63. doi: https://doi.org/10.26439/ing.ind2023.n44.6234

Nadeau, TD. & Gray, K. (2013). SDN: Software Defined Networks. USA, O’Reilly Media Inc.

Nugroho, M. Z. P., Hasibuan, S., & Adiyatna, H. (2021). Application of lean manufacturing to improve procurement Tiempo de Ciclo in the case of the steel industry. IOP Conference Series: Materials Science and Engineering, 1010(1), 012022. IOP Publishing. https://doi.org/10.1088/1757-899X/1010/1/012022

Ris, K. & Puvaca, M. (2024). Digital Transformation Handbook. USA, CRC Press.

Segeč, P., Moravčik, M., Uramová, J., Papán, J. & Yeremenko, O. (Noviembre del 2020). SD-WAN – Architecture, functions and benefits. 18th International Conference on Emerging eLearning Technologies and Applications (ICETA)(pp. 593-599). Košice, Slovenia. doi: http://dx.doi.org/10.1109/ICETA51985.2020.9379257

Shafeek, H., Bahaitham, H. & Soltan, H. (2018). Lean Manufacturing Implementation using Standardized Work. Journal of Computational and Theoretical Nanoscience, 15, 1814-1817. doi: https://doi.org/10.1166/jctn.2018.7316

Steven, E., Chin, J., & Nadlifatin, R. (2022). Implementation of Tiempo de Ciclo improvement in the cutting production process using clustering data mining and lean manufacturing. In The 3rd International Conference on Advance & Scientific Innovation (ICASI), 2022 (pp. 382–391). Knowledge E. doi: https://doi.org/10.18502/kss.v7i10.11377

Tapia, FM. (2023). Experiencia lúdica utilizando la herramienta standard Operating sheet de Lean Manufacturing para mejorar la enseñanza-aprendizaje del trabajo estandarizado. Industrial Data, 26(1), 91-115. doi: https://doi.org/10.15381/idata.v26i1.23828

Verma, P. & Zhang, F. (2020). The Economics of Telecommunication Services, an engineering perspective. Switzerland A, Springer.

Wang, J.X. (2011). Lean Manufacturing, Business Bottom-line Based. USA, CRC Press.

Yang, Z., Chi, Y, Li, B., Liu, Y. & Xu, Y. (Julio 2019). Software-Defined Wide Area Network (SD-WAN). 28th International Conference on Computer Communication and Networks (ICCCN). Valencia, España. doi: https://doi.org/10.1109/ICCCN.2019.8847124

Yik, L. & Chin, J. (June 2019). Application of 5S and Visual Management to improve Shipment preparation of finished goods. IOP Conference Series: Materials Science and Engineering, 530.Penang, Malasya. doi: https://doi.org/10.1088/1757-899X/530/1/012039

Published

2025-12-05